Simple 6-Step Process from Inquiry to Delivery
Send us your requirements via email or WhatsApp. We reply within 2 hours during business hours.
Most quotations that come back wrong come back wrong because the enquiry was thin. A request that says “we need a generator for our factory” gets a guess; a request that says “300 kW, 400 V, 50 Hz, three-phase, site is 1800 m above sea level, ambient 45 °C, one 90 kW motor started direct-on-line” gets a specification. The price gap between those two answers is usually wider than the gap between suppliers — and the second one is the only answer you can hold us to.
The two figures people most often leave out are the ones that change the machine: altitude and ambient temperature. A set rated 300 kW at sea level and 25 °C does not deliver 300 kW at 2000 m and 45 °C. The engine loses air, the alternator loses cooling, and the derate has to come off the rating before we quote — not after the set arrives. Tell us both and the quotation will already carry the corrected figure.
Receive detailed quotation within 24 hours, including:
A quotation that gives one number and nothing else is not a quotation, it is an opening position. Ours separates the set from the options, because most of the money that moves between first enquiry and signed contract sits in the options: canopy grade, controller model, alternator winding, ATS, base tank size, sound attenuation, and whether the set ships in a wooden case or a container.
We also list what is not in the price. On an export order the set is rarely the whole cost — the concrete plinth, the cable run from the set to the changeover, the exhaust through the wall and the fuel line from a bulk tank are all site work, and a supplier who quietly leaves them out is not cheaper, just less clear.
Quotations are valid for 30 days. Beyond that the engine and alternator prices move with the market, and we re-quote rather than honour a number we can no longer buy at.
After confirming the quotation, we sign a purchase contract.
The specification attached to the contract is the document that decides what you receive. It is worth reading it line by line before signing, because “silent type” is not a specification — a canopy grade, a dB figure and the distance it was measured at together are. The same applies to the controller model, the alternator make, and the emission standard the engine is certified to. Anything written loosely in the contract will be delivered loosely.
On L/C terms, send us the draft before it is issued. A letter of credit with a document requirement we cannot meet — a certificate from a chamber of commerce we do not deal with, a inspection certificate naming an agency that has no office here — turns into an amendment and a two-week delay. It costs nothing to check the draft first.
Rigorous quality control at every stage:
The test that matters is the load test, and it is the one worth asking about. A set that starts and idles proves nothing. A set that carries its rated load for a continuous run at the site's ambient temperature proves the radiator is sized correctly, the fuel system holds pressure, the alternator does not overheat, and the controller holds voltage and frequency under step changes. Ask for the report with the load percentage and the duration on it.
If you plan to send an inspector, book them early. Third-party inspection inside the last three days of production is the single most common cause of a missed vessel — the set is finished, the inspector is not available, and the container sails without it. Tell us at order confirmation and we will schedule production so the inspection lands before packing.
Professional export packing and worldwide shipping:
FOB and CIF are not two prices for the same thing. On FOB the set is yours once it is loaded at the Chinese port and you arrange and pay the ocean freight and insurance; on CIF we carry the freight to your port and the risk still passes to you when the goods are loaded. Which one is cheaper depends on whether you have a forwarder you already trust — if you ship regularly, your own rate will usually beat ours, and FOB is the better answer.
Packing follows the transport, not the habit. A set that travels by road within one country needs less protection than one that sits on a wharf for three weeks in a monsoon. Silent canopies ship inside a wooden case or, for multiple units, braced inside a container; open sets are usually palletised and shrink-wrapped. Say how it is travelling and how long it will be in transit, and the packing gets specified rather than assumed.
We stand behind every product we sell:
Warranty covers defects in materials and workmanship. It does not cover consumables — filters, belts, coolant, lubricating oil — and it does not cover damage from a wrong installation, contaminated fuel, or a set run outside its rating. That boundary is normal across the industry, and it is worth knowing before a claim rather than after.
The fastest warranty claim is the one with evidence attached: the serial number, the hours on the controller, a photo of the failed part, and the fault code from the event log. A claim with those four things is usually resolved in one exchange. A claim that says “the generator is broken” takes a week of questions before anyone can even identify the machine.
30% deposit + 70% before shipment
1 unit (single order accepted)
7-15 days (standard models)
1 year or 1000 hours
Six items decide the machine. If you can answer all six, the first quotation is usually the last one.
| Item | Why it changes the answer |
|---|---|
| Running load, kW | Decides the frame. Add up the loads that will run at the same time, not the sum of every nameplate on site. |
| Largest motor and its starter | A direct-on-line motor draws five to seven times its running current. This is what pushes a 300 kW load onto a 400 kW frame. |
| Voltage and frequency | 400/230 V 50 Hz and 480/277 V 60 Hz are different alternator windings and different engine speeds. It cannot be changed after the fact. |
| Altitude and ambient | Both derate the set. 2000 m or 45 °C can take 15 percent off the rating before anything else is discussed. |
| Duty | Standby, prime or continuous. A standby set used as the only source of power will not reach its warranty period. |
| Noise target | The dB figure and the distance. “70 dB” at 1 m and at 7 m are two different canopy grades. |
Two more things worth mentioning up front: whether an ATS is needed (and whether the site's changeover already exists), and how the set will get to its final position — a canopy that fits the plant room but not the door is a problem discovered on delivery day.
An export generator arrives with a folder, and the folder is what your customs broker, your electrician and your insurer will all ask for. Knowing what should be in it saves a week at the port.
| Term | What it means for you |
|---|---|
| EXW | You collect from the factory in Dongguan. Cheapest on paper, and the most work — you arrange export clearance, inland haulage and loading yourself. |
| FOB | We deliver to the vessel at Shenzhen or Guangzhou and clear export. You book and pay the ocean freight. Best choice if you already have a forwarder. |
| CIF | We pay freight and insurance to your port. Convenient for a first shipment; usually more expensive than your own forwarder once you ship regularly. |
On packing: a single silent set normally ships in a wooden case that can be lifted by forklift from any side. Multiple units are braced inside a container — which means the loading plan is decided by the canopy dimensions, so the number of units per 20′ or 40′ container is a quotation-stage question, not a shipping-stage surprise. Small sets and spare parts go LCL; anything large enough to fill a container goes FCL, because LCL handling on a heavy item is where damage happens.
Production runs late. Standard frames are 7–15 days and custom builds 30–45. When a build is going to slip, we tell you the day we know, not the day the vessel sails without it. If the delay is ours and the contract has a delivery clause, the clause applies.
The specification needs to change after signing. It can, up to the point the frame goes into assembly. After that, a canopy grade or controller change means rework and a new date. Changes are quoted in writing before anything is touched — nobody wants to discover an extra line on the final invoice.
The set arrives damaged. Photograph the packaging before opening it, and the damage before touching it. A claim against the carrier without photographs of the packaging as received is very hard to win, and the insurance surveyor will ask for exactly those pictures.
The set will not start on site. Nine times out of ten it is fuel, battery or wiring — in that order. Send the controller's event log and a photo of the battery terminals before assuming the machine is at fault; the DSE panel records the reason it refused to start, and it is usually right.
A: 1 unit. We accept single unit orders with no minimum requirement.
A: Yes, we support full customization including voltage, frequency, noise level, container size, and special accessories.
A: T/T (Telegraphic Transfer) is preferred — 30% deposit, 70% before shipment. L/C at sight is also negotiable.
A: Standard models: 7-15 days. Custom models: 30-45 days. Some popular models (100-500kW) may be in stock.
A: Yes. Free installation in Guangdong province. For other regions, we provide remote technical support and detailed manuals.
A: Yes — the manufacturing plant's CE Declaration of Conformity is supplied with the shipping documents for applicable products.
Send us your requirements and get a free quote within 24 hours.
Get Free QuoteWhatsApp: +86 135-5383-8770 | 24h response