TRANSFER SWITCHES
High Quality TRANSFER SWITCHES for All Major Generator Brands
TRANSFER SWITCHES
Showing 528 products
Shop TRANSFER SWITCHES from Jinjia Power
Jinjia Power offers a comprehensive selection of transfer switches for Stamford, Leroy Somer, Marathon, Basler, Marelli, Mecc Alte, and other major brands. All products are genuine or high-quality compatible replacements.
Leading Transfer Switch Brands & Models
ASCO Power Technologies (Schneider Electric)
ASCO is the global leader in power conversion and control, with over 100 years of experience. Part of Schneider Electric since 2017, ASCO offers the widest range of UL 1008 listed transfer switches from 40A to 4000A.
- ASCO Series 300 (40A–400A): Compact, solenoid-driven ATS for commercial buildings. Features integrated controller with load-shedding capability. Ideal for small-to-medium commercial applications with standard <10s transfer time.
- ASCO 7000 Series (40A–3000A): The industry gold standard for medium and large applications. Programmable controller with SCADA integration, event logging, and modular construction. Available in contactor and motorized types. Used in hospitals, data centers, and industrial plants.
- ASCO Series 800 (100A–3000A): Motorized contact transfer switch with true emergency-rated operation. Double-throw mechanical interlock prevents inadvertent paralleling. Features silver-alloy contacts rated for 200kA SCCR.
- ASCO Series 900 (400A–4000A): Heavy-duty power switch for the most demanding industrial applications. Available with optional bypass-isolation for maintenance without load interruption.
- ASCO 330 Series (40A–200A): Residential and light commercial automatic transfer switch. Compact NEMA 1/3R enclosure, integrated utility-voltage sensing, and exercise timer.
Cummins / Onan Generators
Cummins Power Generation (formerly Onan) manufactures integrated power systems including generators, ATS units, and paralleling switchgear. Their transfer switches are designed for seamless integration with Cummins generator sets.
- Cummins OTPC (100A–400A): Open-transition power command automatic transfer switch. Features the PowerCommand® controller with integrated load management. Compact footprint, NEMA 1/3R/12 enclosures. Standard for commercial and institutional standby.
- Cummins OTPCN (200A–4000A): Closed-transition capable, service entrance rated. Supports utility-interactive applications per NEC 705. Available with bypass-isolation configuration. Integrated neutral overlap for 4-pole configurations.
Generac Power Systems
Generac is the largest manufacturer of standby generators in North America, with transfer switches designed specifically for residential and light commercial applications with their generator lineup.
- Generac RTSN (100A–400A): Automatic transfer switch with Nexus® controller compatibility. Features 24VDC control circuit for safe low-voltage wiring between switch and generator. Service entrance rated, suitable for whole-house backup.
- Generac GTTN (200A–600A): Heavy-duty commercial transfer switch. Motor-operated mechanism with programmable exercise schedule. Available in NEMA 1, 3R, and 12 enclosures. Integrated with Generac's Mobile Link™ remote monitoring.
Ruskin (Modine)
Ruskin, part of Modine Manufacturing, specializes in critical power transfer switches for mission-critical facilities. Known for robust construction and fast transfer times.
- Ruskin MSTS (100A–4000A): Motorized transfer switch with mechanical interlock. Designed for emergency and standby applications. Silver-alloy contacts, 200kA withstand rating. Bypass-isolation models available for maintenance without downtime.
- Ruskin ATSE (200A–3000A): Automatic transfer switch with advanced digital controller. Programmable transfer timers, load-shedding contacts, and generator exercise scheduling. UL 1008 listed for emergency use.
Zenith Controls (Cummins)
Zenith Controls, now part of Cummins, is renowned for heavy-duty contactor-type transfer switches used in the most demanding industrial and mission-critical applications worldwide.
- Zenith ZTC (200A–4000A): Double-throw motorized contact switch. True emergency-rated with 10-cycle transfer. Features visible contact position, silver contacts, and mechanical interlock with electrical interlock backup. Available with bypass-isolation for zero-downtime maintenance.
- Zenith ZTN (400A–4000A): Next-generation transfer switch with integrated digital controller. Supports open, closed, and delayed-transition modes. SCADA-ready with Modbus/BACnet communication. Used in Tier III/IV data centers, hospitals, and semiconductor fabrication plants.
Transfer Switch Applications by Industry
Data Centers — Tier III / Tier IV Requirements
Data centers require the highest level of power reliability. Tier III facilities (99.982% uptime, 1.6 hours max downtime/year) require concurrently maintainable power distribution with ATS-rated transfer switches at every distribution level. Tier IV facilities (99.995% uptime, 26.3 minutes max downtime/year) demand fault-tolerant design with continuous cooling and transfer times under 16ms using static (solid-state) transfer switches.
Typical configuration: Dual utility feeds + N+1 generator redundancy. Each generator module (typically 1500kW–3000kW diesel units) connects through a paralleling switchgear with individual ATS units. Main distribution uses 2000A–4000A, 480V/3-phase transfer switches with 200kA AIC rating. UPS systems provide ride-through power during the 10–15 second generator start window. Static transfer switches (STS) rated at 200A–800A provide sub-millisecond transfer for critical IT loads.
Hospitals & Healthcare Facilities
Hospitals must comply with NFPA 110 Type 10 (10-second restoration requirement) and NEC Article 517. The emergency power system is divided into three branches:
- Life Safety Branch (emergency lighting, fire alarms, communications): Must restore within 10 seconds. Served by a dedicated ATS. Typically 200A–600A, 480V.
- Critical Branch (surgical suites, ICU equipment, life support systems): Served by separate ATS with isolated ground. Must maintain power within 10 seconds with no interruption to life-critical circuits.
- Equipment Branch (HVAC for critical spaces, medical gas systems, elevators, large medical equipment): May have up to 60-second restoration time per NEC 701.
Typical configuration: 3+ transfer switches per hospital. Main ATS: 1200A–2000A, 4-pole, service entrance rated, 65kA AIC. Generator plant: 2–4 units of 500kW–2000kW each. 4-pole switches mandatory per NEC 517.30 to prevent objectionable current through patient care areas. All switches must be tested monthly under load per NFPA 110.
Commercial Buildings
Commercial office buildings, retail centers, and mixed-use developments typically fall under NEC Article 701 — Legally Required Standby. This applies where local ordinances mandate backup power for egress lighting, fire pumps, elevators (in high-rises per IBC), and essential building management systems. Typical configuration: Single 400A–800A ATS, 480V/3-phase, with a 500kW–1500kW diesel or natural gas generator. Transfer time allowance: 60 seconds per NEC 701. Service entrance rated where the transfer switch is the building's main disconnect.
Industrial Facilities
Industrial plants face unique challenges with motor starting currents that can reach 6× Full Load Current (FLC) for direct-on-line (DOL) motor starting. Transfer switches must be sized to withstand these inrush currents without contact damage. Per NEC 430.62, the transfer switch must be rated for the sum of all motor FLCs plus non-motor loads.
Voltage sag tolerance: During transfer, voltage may dip below the ride-through threshold of variable frequency drives (VFDs) and process controllers. Industrial ATS units should specify closed-transition transfer with synchronism check relays to minimize voltage disturbance. Typical configuration: 800A–3000A, 480V/3-phase, 100kA–200kA AIC. Generator plant: 1000kW–5000kW. Motor loads require transfer switches with AC-33B utilization category rating.
Telecommunications Base Stations
Telecom facilities require dual-voltage backup power. The -48V DC plant (rectifier-based) handles critical telecom switching and transmission equipment, while 480V AC powers cooling, building services, and auxiliary systems. Typical configuration: Two transfer switches — a small 100A–200A ATS for 480V AC loads (generator to utility), and a DC plant with battery string providing seamless ride-through. Generator start: 10–15 seconds after utility failure. Battery autonomy: 4–8 hours minimum per Telcordia GR-487. Automatic transfer switches must be monitored via SNMP or BACnet for central operations center (NOC) integration.
Transfer Switch FAQ — Frequently Asked Questions
What is the difference between ATS and MTS?
An Automatic Transfer Switch (ATS) automatically detects utility power failure, signals the generator to start, and transfers the electrical load to generator power without human intervention — typically within 5–15 seconds total. A Manual Transfer Switch (MTS) requires an operator to physically switch the load from utility to generator power. ATS units are required for emergency systems (NEC Article 700) and legally required standby systems (NEC Article 701). MTS units are only permitted for optional standby loads (NEC Article 702) where immediate power restoration is not critical.
What transfer time do I need for my application?
Transfer time requirements vary by application: Emergency systems (hospitals, fire pumps): <10 seconds per NFPA 110 and NEC 700. Legally required standby: <60 seconds per NEC 701. Data centers (IT loads): The generator start time (10–15 sec) is bridged by UPS systems; however, the transfer switch itself should operate within <10 cycles (<167ms). Critical processes (semiconductor fabrication, banking servers): <16ms using static (solid-state) transfer switches to prevent any measurable interruption. Commercial HVAC: Standard <10 second transfer is acceptable as long as the UPS covers critical controls.
How do I size a transfer switch for my generator?
Size the transfer switch based on the maximum connected load, not the generator capacity. Calculate the total load in amperes: for resistive loads, use nameplate ratings directly; for motor loads, use 125% of the largest motor FLA plus 100% of all other loads (per NEC 430.63). The transfer switch amperage rating must equal or exceed this calculated load. Common practice: a 200A transfer switch for a 50kW–60kW generator, 400A for 100kW–125kW, 600A for 150kW–200kW, 800A for 250kW–300kW. Always verify the AIC (short circuit) rating exceeds the available fault current at the installation point.
What is the AIC rating and why does it matter?
AIC (Available Interrupting Capacity), also called SCCR (Short Circuit Current Rating), is the maximum fault current the transfer switch can safely withstand during a short circuit event without exploding or causing a fire. If the available fault current at your installation point exceeds the switch's AIC rating, the switch could catastrophically fail during a fault — creating an arc flash hazard. Per NEC 110.24, you must calculate available fault current (or obtain it from the utility) and ensure all equipment ratings are adequate. Typical values: 22kA for residential/commercial, 65kA–100kA for industrial, 200kA for utility-adjacent installations.
Can a transfer switch handle non-linear loads (VFDs, UPS)?
Yes, but with important considerations. Non-linear loads like VFDs and UPS systems produce harmonic currents (typically 3rd, 5th, 7th harmonics) that cause: (1) excess heating in switch contacts and bus bars, (2) neutral conductor overload (3rd harmonics add in the neutral), and (3) electromagnetic interference with the ATS controller. For installations with >20% non-linear load, specify: a transfer switch with 200% neutral rating, derated current capacity (typically 80% of nameplate), and silver-alloy contacts rated for high harmonic environments. Consult the manufacturer's application notes — ASCO and Zenith both publish derating tables for non-linear loads.
What certifications should I look for (UL 1008, CSA, IEEE)?
The essential certifications for transfer switches in North America: UL 1008 — Transfer Switch Equipment (mandatory for all US installations). CSA C22.2 No. 107.1 — Required for Canadian installations; dual UL/CSA listing is common. IEEE 1547 — Required when the transfer switch is part of a utility-interactive (grid-tied) generator system for anti-islanding protection. NFPA 110 — Defines performance requirements for emergency and standby power systems (Type 10 = 10-second restoration, Level 1 = hospital-grade). NEMA 250 — Enclosure ratings for indoor/outdoor/corrosive environments. Always verify the specific listing on the UL Product iQ database before purchasing.
How often should transfer switches be tested?
Per NFPA 110 and The Joint Commission (TJC) requirements: Monthly — All emergency and legally required standby transfer switches must be tested under load for a minimum of 30 minutes. Testing includes: automatic start on simulated utility failure, transfer to emergency source, retransfer to normal source, and generator cool-down shutdown. Annually — Comprehensive maintenance inspection including: thermographic (infrared) scanning of all connections, contact resistance measurement, insulation resistance (megger) testing, exercise timer verification, battery load testing, and controller firmware updates. Every 3–5 years — Major overhaul including contact replacement (if pitting exceeds manufacturer limits), spring tension adjustment, and mechanical timing verification. Residential MTS units should be tested at least annually.
What is the difference between service entrance and non-service entrance rated?
A service entrance rated transfer switch can serve as the building's main disconnect switch — it is the first overcurrent protective device after the utility meter. These switches include a main circuit breaker or fused disconnect rated for the full service capacity (e.g., 200A, 400A, 800A) with a solidly grounded neutral that can be switched. A non-service entrance rated transfer switch is installed downstream of the main service disconnect — it only switches feeder circuits to specific loads. Non-service entrance switches do not include the main neutral-to-ground bond. If your transfer switch is installed after the main breaker panel, you need non-service entrance rated; if it replaces the main panel entirely, you need service entrance rated.
Can I use one transfer switch for multiple generators?
A single transfer switch can connect to one emergency/standby source per UL 1008 listing. However, multiple generators can be combined into a single source through generator paralleling switchgear. In this configuration, all generators synchronize and connect to a common bus, and a single transfer switch transfers between utility and the paralleled generator bus. For N+1 redundancy (e.g., 3 generators with any 2 able to carry full load), use paralleling switchgear with load-sharing controls, then a single main transfer switch. Alternatively, some facilities use multiple transfer switches — each serving a separate load bus — all connected to the same generator bus through individual feeder breakers. Consult a licensed electrical engineer for multi-generator system design per NEC 445 and IEEE 446.
What maintenance does a transfer switch require?
Regular maintenance extends transfer switch life and ensures reliable operation during emergencies: Monthly — Visual inspection for unusual sounds, smells, or discoloration; verify controller displays normal status; check battery voltage (if controller has battery backup). Quarterly — Clean air filters on enclosed switches; inspect for corrosion on terminals; verify exercise timer operation. Annually — Infrared thermographic scan of all connections (look for hot spots indicating loose connections); measure contact resistance (should be <100 micro-ohms for clean contacts); insulation resistance test (>100 megohms at 1000V DC); verify transfer and retransfer timing; clean contacts if accessible; lubricate mechanical linkages per manufacturer specifications. Every 5 years — Contact inspection/replacement (silver contacts typically last 2,000–5,000 operations under load); spring mechanism inspection; controller firmware update. Keep detailed maintenance logs per NFPA 110 Section 8.3.7.