SAME DAY SHIPPING ON ALL STOCKED PRODUCTS
86-0769-89610677 / 86-13553838770 | info@jinjiadongli.com
375 kVA diesel generator set

375 kVA GENERATOR

JJP-M300GF — 375 kVA / 300 kW prime, 413 kVA / 330 kW standby. 541 A per phase at 400 V, 3100 × 1350 × 1850 mm, 1900 kg, 67.2 L/h at full load. FOB China US$20,000–28,000.

See the Full Specification
Other ratings in this range 100 kVA200 kVA250 kVA375 kVA500 kVAAll 50–625 kVA

375 kVA Generator — JJP-M300GF

Prime (PRP)
375 kVA
300 kW at 0.8 PF
Unlimited hours, 10% overload for 1 h in 12
Standby (ESP)
413 kVA
330 kW at 0.8 PF
Loss of mains only, 200 h/yr

375 kVA is the prime rating on the nameplate, not a rounded-up figure — the frame maps exactly onto the requirement. 1500 rpm at 50 Hz, 1800 rpm at 60 Hz, three-phase four-wire, 0.8 power factor.

How Many Amps Is a 375 kVA Generator?

VoltagePhaseCurrent at 375 kVASuggested breaker frame
380 V3-phase570 A700 A
400 V3-phase541 A700 A
415 V3-phase522 A630 A
440 V3-phase492 A630 A
480 V3-phase451 A630 A
220 V1-phase1705 Aspecial winding
240 V1-phase1562 Aspecial winding

I = kVA × 1000 ÷ (√3 × V). Breaker sizing at 125% of the 400 V figure gives 676 A. Cable at 541 A needs roughly 2 × 120 mm² copper per phase for a run under 50 m. A single-phase 375 kVA set would need a bespoke alternator — balance the load across three phases instead.

Dimensions and Weight

ConfigurationL × W × HWeight
Open skid3100 × 1350 × 1850 mm1900 kg
Silent canopy3700 × 1950 × 2450 mm2080–2150 kg
With full baseframe tank—+250–400 kg depending on tank size

At 1900 kg the open set lifts with a forklift; the canopied version needs a crane or a heavy forklift. Allow 1 m clearance at the alternator end for cooling air and confirm canopy door swing on both long sides before siting. Cast a level concrete plinth rated for 1.5× the wet weight.

Fuel Consumption per Hour

LoadDiesel L/hUS gal/h
375 kVA / 300 kW (100%)67.2 L/h17.7
300 kVA / 240 kW53.7 L/h14.2
225 kVA / 180 kW40.3 L/h10.6
150 kVA / 120 kW26.9 L/h7.1
75 kVA / 60 kW13.4 L/h3.5

Based on ≤187 g/kWh at 835 g/L diesel density — about 0.179 L per kVA per hour at rated load. Consumption tracks load almost linearly in this class, so a set held at 50% for 12 hours a day burns roughly half the full-load figure for twice as long: the fuel bill per kWh barely changes, but the engine runs cleaner.

Engine Options on the 375 kVA Frame

BrandEngine modelStandby outputCylindersDisplacement
WeichaiWP12D353E200353 kW6-cyl11.6 L
SDECE-series330 kW6-cyl12 L
Perkins2206A-E13TAG2330 kW6-cyl13 L
VolvoTAD733GE313 kW6-cyl7.2 L
YuchaiYC6M400-D20294 kW6-cyl10.3 L

Coupled to a Faraday FD4M-4 or Stamford HCI444 alternator, with a Deep Sea DSE7320 MKII controller as standard and DSE8610 for parallel operation. At 375 kVA the engine choice moves both price and serviceability — Cummins and Perkins have the widest parts network in Africa and the Middle East; Weichai and SDEC are the cost-competitive options with strong regional support; Volvo suits projects with emission or brand requirements. Note the Yuchai standby output: confirm the derate before specifying it for a continuous load.

What Can a 375 kVA Generator Power?

Factory or production line
240–270 kW of connected load. At this size motor starting is the constraint — sequence the largest drives rather than oversizing the set.
Mid-size hotel or retail
180–250 rooms, or 6,000–8,000 m² of retail. Runs HVAC, lifts and kitchen without shedding non-essential circuits.
Hospital wing or district clinic
150–220 beds with theatres and imaging. Often specified as 2 × 375 kVA in parallel for N+1.
Colocation or server hall
20–28 racks at 10 kW each with UPS and cooling on the generator bus. Parallel configuration is normal here.
Water treatment plant
Large pump sets starting in sequence. Sequence the starts — two 150 kW pumps together will trip a 375 kVA set.
Mining or quarry camp
Crushers, conveyors and camp accommodation. Specify heavy-duty air filtration and fuel polishing for dust and long storage.

What Does a 375 kVA Generator Cost?

Open-skid JJP-M300GF sets run US$20,000–28,000 FOB China. Engine brand moves that band more than anything else — Cummins and Perkins sit at the top, Weichai and SDEC at the bottom. A sound-attenuated canopy adds 8–12% and about 200 kg. Budget separately for a 700 A breaker, an ATS if the site needs automatic transfer, a synchronising panel if two sets run in parallel, and freight. Local market prices in India, Pakistan, Nigeria and South Africa usually run 40–80% above FOB once duty, inland freight and dealer margin are added — compare like for like before quoting a landed figure.

375 kVA Generator Questions

How many amps does a 375 kVA generator deliver?

541 A per phase at 400 V three-phase, 570 A at 380 V, 522 A at 415 V, 451 A at 480 V. Size the breaker at 125% of the 400 V figure.

What does a 375 kVA generator weigh?

1900 kg on an open skid, 3100 × 1350 × 1850 mm. The silent canopy adds 180–250 kg and 300 mm per dimension, giving about 2080–2150 kg before fuel.

How much fuel does a 375 kVA generator use per hour?

67.2 L/h at full 375 kVA load, 40.3 L/h at 50% load. That is 0.179 L per kVA per hour — consumption is close to linear with load in this class.

Is 375 kVA the same as 300 kW?

At 0.8 power factor, yes — 375 × 0.8 = 300 kW. A lower site power factor reduces the usable kW further, so check the PF before confirming the rating.

Can two 375 kVA sets run in parallel?

Yes, with the DSE8610 controller, matching alternator pitch and a synchronising panel. Two sets give 750 kVA total, or N+1 redundancy at 375 kVA. Specify it at the quote stage — retro-fitting is expensive.

Which engine brand should I choose?

Cummins and Perkins for parts availability across Africa and the Middle East; Weichai and SDEC for cost with strong regional support; Volvo where emissions or brand specification matter; Yuchai only where its lower standby output still clears the load.

What noise level should I expect?

65–75 dB(A) at 7 m for the canopied set, depending on acoustic grade. Residential-grade units sit at the low end; standard export canopies at the high end.

Single phase or three phase?

Three-phase is standard at this rating. A single-phase 375 kVA set needs a specially wound alternator and is rarely economic above 50 kVA — split the load across three phases instead.

Send the load schedule, get a firm FOB price

Running kW, largest motor, duty and destination port — we will confirm the engine option, the tank size and the canopy grade, and price it landed-ready.

Request a Quote